Heres the latest video on the shop wall renovation. Not a whole lot of progress, but I did manage to finish the last of the electrical access panel frames.This last frame was the tricky one, incorporating a door to reach the electrical panel. Next up in the shop will be filling the 2nd layer of insulation around the electrical access and window frames.
Read More..
Tampilkan postingan dengan label electrical. Tampilkan semua postingan
Tampilkan postingan dengan label electrical. Tampilkan semua postingan
Minggu, 03 April 2016
Minggu, 20 Maret 2016
A House In The Trees Part VIII
With the walls and lower shed roof done, this video documents the clear-story and main roof framing.
I framed the clear-story to accommodate the windows Im going to fabricated using some Kalwall samples I have. Im not yet sure if the main roof will receive a skylight or not, but if it does I wont bother to cut out the rafters within the skylight footprint. It is, after all, just a tree house.
If youd like to catch up on how the Tree House got to this point, be sure to check out these older posts.I framed the clear-story to accommodate the windows Im going to fabricated using some Kalwall samples I have. Im not yet sure if the main roof will receive a skylight or not, but if it does I wont bother to cut out the rafters within the skylight footprint. It is, after all, just a tree house.
Diposting oleh baw di 05.26 0 komentar
Label: a, door, electrical, frame, house, in, panel, part, the, trees, viii, Woodworking Projects
Langganan:
Postingan (Atom)